LAKE WALLENPAUPACK WATERSHED MANAGEMENT DISTRICT

F. X. BROWNE, INC. PROGRESS REPORT FOR JUNE-JULY 2005

PA1012-46 - FY 1998 EPA GRANT PROJECT

Water Quality Monitoring – F. X. Browne, Inc. continued work on reestablishing the atmospheric deposition sampling site.  We received permission from PPL to reinstall the sampler and began gathering equipment needed for the reinstallation.

TMDL – F. X. Browne, Inc. finalized a time extension and funds redistribution request letter to Fred Suffian and sent it to Karen for submission to the EPA.  

Brochures – F. X. Browne, Inc. continued work on revisions to all of the brochures.  

Project Management and Documentation - F. X. Browne, Inc. continued providing project management and documentation services. F. X. Browne, Inc. conducted the following tasks:  

  1. Prepared the progress reports for the project,
  2. Emailed and mailed the progress report to all Board Members,
  3. Changed progress report to pdf format and uploaded to the LWWMD website,
  4. Provided overall project management services, including scheduling of task work, review of charges, and preparation of detailed invoice descriptions.

PA1012-52 - FY 1999 EPA GRANT

Effectiveness of BMP Controls – F. X. Browne, Inc. worked with Karen to continue monitoring of the Bakker Marina BMP and the Carroll Krautter BMP. 

Create an Ecosystem – During June 2005, F. X. Browne , Inc. designed and completed a draft version of the Sixth Grade Create-a-Wetland presentation. F. X. Browne , Inc. also made minor changes and refinements to the other seven presentations.

F. X. Browne, Inc. prepared presentation scripts, teacher’s handouts, and student handouts (including book lists, internet links, and vocabulary lists) for all eight presentations. We also produced draft versions of two hands-on activities to accompany the seventh and eighth grade presentations.

All eight of the draft presentations and accompanying materials were burned onto a CD and sent to Dr. Browne for his review and comments.  We are currently reviewing the draft presentations.

Project Management and Documentation - F. X. Browne, Inc. continued providing project management and documentation services. F. X. Browne, Inc. conducted the following tasks:

  1. Prepared the progress report for the project,
  2. Emailed and mailed the progress report to all Board Members,
  3. Changed progress report to pdf format and uploaded to the LWWMD website, and
  4. Provided overall project management services, including scheduling of task work, review of charges, and preparation of detailed invoice descriptions.

PA1012-55 - LWWMD GROWING GREENER PROJECT

During June and early July, 2005 we finalized the spreadsheets that included the water quality data, stream level data, stream flow data, and rain data for the project.  We updated the project spreadsheets and performed general data calculations. F. X. Browne , Inc. also began writing the final technical report for the project as well as the brief summary report for Growing Greener.

Additionally, we met with Andy Schweitzer, the DEP Growing Greener Representative for this project, gave him a tour of the sampling stations, and requested additional funds and a time extension to complete the project.  As requested by Andy, we prepared a time extension and request for additional funds for Karen’s signature that was sent to the DEP.  At the end of July, we received notice from the DEP that the project would be extended until December 300, 2005 and they would give the District an additional $12,000 to complete the project. 

We inventoried all of the stations, prepared a list of required repairs and replacement parts that would be needed to get the samplers up and running, returned several parts to ISCO to determine if they could be repaired or needed to be replaced, discussed potential repairs and replacements with ISCO, and placed an order for needed parts.  We received the parts and are planning to install the new parts and get the samplers back online within the next two weeks.

PA1012-58 - BMPs

Billing Group 001 – Project Management  

  1. F. X. Browne, Inc. provided overall project management services for all of the active BMP design projects,
  2. Received and reviewed the June Board Meeting Minutes,
  3. Prepared a project status report for the July Board Meeting, and
  4. Discussed Landowner Agreements and bidding the projects with Karen M.

Billing Group 005 – Emil Swingle Farm Project

  1. Made minor changes to the plans based on comment from Emil Swingle.  Sent revisions to Karen so she could show Swingle and get agreement signed,
  2. Modified Contract Documents and Bidding Documents to account for bidding Swingle and W. Keating projects together,
  3. Coordinated with Karen to establish bidding date, pre-bid meeting date, and bid opening date,
  4. Made 15 copies of plans, specifications, contract documents, and bidding documents and sent 10 copies to Karen for her use,
  5. Prepared a Notice to Bid and sent to Karen for her use, and
  6. Received and responded to Contractor questions.

Billing Group 006 – John Pawlowski Farm Project

  1. Discussed project on several occasions with Karen Mandeville.

Billing Group 008 – Will Keating Farm Project  

  1. Modified Contract Documents and Bidding Documents to account for bidding Swingle and W. Keating projects together,
  2. Coordinated with Karen to establish bidding date, pre-bid meeting date, and bid opening date,
  3. Made 15 copies of plans, specifications, contract documents and bidding documents and sent 10 copies to Karen for her use,
  4. Prepared a Notice to Bid and sent to Karen for her use, and
  5. Received and responded to Contractor questions.

Billing Group 011 – Jim Keating Farm  Project

    1.   Discussed project with Karen Mandeville on several occasions.

PA1012-63 – 2005 GENERAL ENGINEERING  

During the month of June 2005, F. X. Browne, Inc. performed the following tasks:

    1.      Prepared for and attended the June Board meeting, and
   
2.      Held telephone conversations with Karen Mandeville regarding various topics.

PA1012-64  2005 LAKE WALLENPAUPACK WATER QUALITY MONITORING PROJECT

F. X. Browne , Inc. coordinated the June and July 2005 sampling events for Lake Wallenpaupack .  On June 1, 2005 and July 5, 2005 , we collected surface, middle, and bottom water samples for chemical analysis at Station #3, and on June 15, 2005 and July 20, 2005 , we collected surface, middle, and bottom water samples for chemical analysis at Stations #1, #3, and #5.  In addition, on each sampling date we collected photic zone composite samples for chlorophyll a and phytoplankton analyses.  We also collected temperature and dissolved oxygen profile data at 1 meter intervals from the surface to the bottom.  We then transported all samples to our laboratory in Marshalls Creek and analyzed them for total phosphorus, dissolved reactive phosphorus, total Kjeldahl nitrogen, nitrate/nitrite nitrogen, ammonia nitrogen, total suspended solids, alkalinity (surface samples only), and pH.

A summary of the water quality data for June and July 2005 is provided in Appendix A.

 